Project Information

Client & Location
Turbine Specs
kW
Years
Financials / Incentives
$/kWh
Example: 9.94 cents = 0.0994 or "9.94 / 100"
$/kWh
$/kWh
Analysis Parameters
Years
%
Default: 97% confidence level
$/day
Calculating...
2 minutes remaining

Gearbox Failure Modeling

Planetary Stage / LSS
Without MetalSCAN
With MetalSCAN
Years
Monitored by MetalSCAN
53% reduction (16 days saved)
50% reduction ($125k saved)
15% reduction ($12k saved)
IMS / HSS Bearing
Without MetalSCAN
With MetalSCAN
Years
Monitored by MetalSCAN
53% reduction (4 days saved)
12.5% reduction ($10k saved)
1 minute remaining

Condition Monitoring Costs

Borescope Costs
Without MetalSCAN
With MetalSCAN
MetalSCAN Costs
Without MetalSCAN
With MetalSCAN
N/A
N/A
Add project-specific costs (optional)
Your personalized savings analysis is seconds away

Project Information
Client & System
1 minute remaining